Kenya Power has resumed the fourth phase of the last mile project that connects homes to the national grid at a subsidised cost which was stopped after local contractors were locked out.
Local contractors moved to Public Procurement Regulatory Authority (PPARB) in 2020 to challenge the project citing unfair treatment in the tendering process, delaying the project.