The State has picked a consortium of two firms —Grid Solution SAS and Indian firm Larsen & Toubro — to build a new Sh12.26 billion national electricity dispatch hub to be managed by the Kenya Electricity Transmission Company (Ketraco).
The National System Control Centre (NSCC) is currently located on Nairobi’s Juja Road and has been run by Kenya Power until January 2022 when the Energy and Petroleum Regulatory Authority (Epra) stripped it of its role.