Kenya eyes green energy for baseload electricity by 2028

SmartCo

Green hydrogen is currently regarded as an eco-friendly alternative to oil. PHOTO | SHUTTERSTOCK

Kenya targets to tap green hydrogen as its baseload power by 2028 in a phased plan estimated to cost Sh148.5 billion ($1 billion), underlining the country’s push to fully green the grid.

Baseload power refers to the minimum amount of electric power needed to be supplied to the electrical grid at any given time.

PAYE Tax Calculator

Note: The results are not exact but very close to the actual.